Oil & Gas Processing Facility — Industrial Scan to BIM
The situation
This site's scope was 165 hectares, and it never held still: capture ran intermittently over two years, alongside active construction, rather than as one visit to a finished plant. Given the sensitivity of the site, this case study is deliberately kept without a named client or location.
The approach
Access, not scale, was the real constraint. Elevated structural steel, zones running at process temperature, and a commissioning area tight enough on work permits and safety sign-off that every visit had to be scheduled around it — all captured with the same Total Station and FARO workflow we run on every industrial site. LOD landed at 300 across most of the facility and up to 400 wherever a specific unit needed finer detail, not one blanket spec applied everywhere.
The outcome
Two years in, the facility has an as-built record that grew alongside construction instead of describing it after the fact — coordination and maintenance planning now work against a model that's rarely more than a few months out of date.






Services used
Questions about this project
Why isn't this case study more specific about the client or location?
Why did capture take place over two years instead of one site visit?
What made access the hardest part of this project?
Why does the LOD vary across the same facility instead of one consistent level?
Can this be done without publicly disclosing the details of our facility?
Scope your project in one call.
Tell us the site, the deliverable, and the deadline — we'll tell you the tier and turnaround that fits.
