Heritage Building Survey
The situation
Heritage structures rarely have accurate original drawings to renovate against — settlement, old repairs, and construction-era tolerances all drift from whatever was originally drawn. Closing that gap, for this historic masonry building, had to happen before renovation planning could even start.
The approach
Capture ran at the same accuracy standard as any modern structure — Total Station control network, FARO point cloud — but with closer attention than usual to the irregular masonry surfaces and non-orthogonal walls a purely CAD-drafting approach tends to smooth over. Overlaying the resulting point cloud against a colored BIM floor plan let the renovation architects compare the two directly, wall by wall.
The outcome
Real geometry replaced assumption. Right angles and wall thicknesses that would otherwise have been taken as given were instead measured — the kind of mismatch that, left unchecked, surfaces mid-construction instead of on a drawing.

Services used
Questions about this project
Why couldn't the original architectural drawings be used instead of a fresh survey?
Was the building's irregular geometry corrected or straightened in the drawing?
How was the point cloud used alongside the renovation design?
Is this level of care standard for every heritage project, or specific to this one?
What accuracy was delivered on this project?
Scope your project in one call.
Tell us the site, the deliverable, and the deadline — we'll tell you the tier and turnaround that fits.